Porous Warm Mix Goes On Parade

Asphalt Pavement Magazine, Nov / Dec 2011

An innovative warm-mix design eliminates fibers from porous asphalt
By Tom Kuennen

An innovative warm-mix asphalt design for a porous asphalt pavement at the U.S. Marine Corps Parris Island, South Carolina, Recruit Depot eliminated fibers often used for stability of the open-graded mix, while giving the Marine Corps a “green grinder,” or parade ground, it can be proud of.

The porous asphalt design also eliminated the expense of creating a detention pond and associated environmental requirements.

Porous asphalt pavement is an environmentally sustainable infrastructure design that helps property owners manage storm water effectively and inexpensively.

Typically, a porous asphalt pavement will be composed of, from the bottom, an uncompacted soil sub-grade which will optimize infiltration of water into the aquifer; a geotextile fabric that will permit water to pass but preclude movement of fines up into the structure; a stone recharge bed with same-sized aggregate and 40 percent voids; an optional stabilizing or “choker” course of single-size crushed stone smaller than that in the recharge bed; and an open-graded asphalt surface with 20 percent voids that permit storm water to flow through the pavement into the stone recharge bed.

Read the Article

 

This entry was posted in General News, New Technology, News, Pavement Design/Const., Pavement Pres. Apps., Treatments. Bookmark the permalink.

Comments are closed.