The Florida Department of Transportation Research has released a report that highlights an initiative aimed at improving delivery time, safety, and the environment on and around construction projects, including through fabricating bridge components off-site to reduce on-site construction activities.
Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges
This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News. Bookmark the permalink.