TERRA E-News, January 2013 – Volume 7, Number 1
WisDOT also posted a video in fall 2012 highlighting a pilot project using geosynthetic-reinforced soil in an integrated bridge system (GRS-IBS) on a low-volume state trunk highway bridge in northwest Wisconsin. The video discusses the research that led to the project, the lessons learned from the implementation of the technology, and the future use of the system through the FHWA Every Day Counts initiative. View at www.youtube.com/watch?v=frxx9J7qiWU.