Skip to content
  • Home
  • About TSP2
    • Mailing Lists
    • Oversight Panel
      • Minutes and Presentations
    • Member Organizations
    • CPAR Video
  • Certification
    • Agency Certification
    • Contractor Employee
    • Company Certification
    • Certified Employees
    • Certified Companies
    • Certification Webinar
    • Upcoming Exams
    • Web-Based Training Courses
    • Online Certification Exam
  • Standard Specifications
  • Site Map
← Research Pays Off: Low-Cost and Environment-Friendly Asphalt-Treated Mixtures: Louisiana Tests Designs
Pavement Edge Treatment →

Performance of Steel Pipe Pile-to-Concrete Cap Connections Subject to Seismic or High Transverse Loading: Phase III

2013-03-01

The Montana Department of Transportation has released a report that investigates the efficacy of a new procedure developed to design concrete filled steel tube (CFT) piles to concrete pile cap connections.

Read the Report

 

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News. Bookmark the permalink.
← Research Pays Off: Low-Cost and Environment-Friendly Asphalt-Treated Mixtures: Louisiana Tests Designs
Pavement Edge Treatment →

Comments are closed.

  • TSP2 Search

  • Categories

  • Archives

  • Contact Us

    Email:  ncpp@egr.msu.edu
    Phone:  (517) 432-8220
  • Address

    2857 Jolly Road
    Okemos, MI 48864
    Map
  • Hours of Operation

    8 am - 5 pm
    Eastern Time
© 2025 - TSP2