Expansion Joint Noise Reduction on the New Tacoma Narrows Bridge

The Washington State Department of Transportation has released a report that highlights the collaborative process, methodology, results, and lessons learned from a project that reduced expansion joint noise on the Tacoma Narrows Bridge.

Read the Report

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports, Treatments. Bookmark the permalink.

Comments are closed.