TRB’s second Strategic Highway Research Program (SHRP 2) has released a video that helps demonstrate how typical bridges can be replaced quickly and cost-effectively with accelerated techniques that do not require special equipment. The video highlights the specific techniques used to deliver a new bridge with only a 10-day closure. The design tool kit used in the project was developed through SHRP 2.
ABC for Everyday Bridges
This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News. Bookmark the permalink.