The U.S. Federal Highway Administration has released a tech brief that discusses the lap splice length of un-tensioned pre-stressing strand in field-cast ultra-high performance concrete.
Splice Length of Prestressing Strand in Field-Cast Ultra-High Performance Concrete Connections
This entry was posted in Bridge Design/Const., Bridge Pres. Apps., New Technology, News, Pavement Design/Const., Pavement Pres. Apps., Studies / Reports. Bookmark the permalink.